以下哪项活动不是企业数据架构影响项目范围边界的方式?
(A)确保有足够的数据复制控制
(B)提供项目的企业数据需求
(C)执行设计审查以确保支持长期组织战略
(D)确保有效记录企业业务流程 答案解析: 业务流程不是DMBOK的聚焦点
参考答案
继续答题:下一题


更多CDMP数据治理试题
- 1By comparing the system of record and systems of reference to each other, it is possible to:通过相互比较记录系统和参考系统,有可能:()?
- 2Apart from security requirements internal to the organisation, what other strategic goals should a Data Security Management system address?除了企业内部安全需求之外,哪些战略目标需要数据安全管理系统支撑?:()?
- 3以下哪项活动不是企业数据架构影响项目范围边界的方式?
- 4A characteristic of information quality that measures the degree of the data granularity is known测量数据粒度的程度的信息质量的特性是已知的。:()?
- 5According to the ISO/IEC 42010:2007 Software and Systems Engineering-Architecture Description, which of the following describes the definition of architecture:根据ISO/IEC 42010:2007软件和系统工程-体系结构描述,以下哪一项描述了体系结构的定义::()?
- 6All of the following techniques can be used to facilitate automated retrieval of structured and unstructured data EXCEPT以下所有技术都可用于促进结构化和非结构化数据的自动检索,除了:()?